Project Overview
We delivered a full extension and interior fit-out for a growing independent gym. The scope re-planned circulation, added robust changing rooms and shower blocks, and upgraded the training floor with new rigs, storage and lighting to increase capacity and member experience. Phase 2—a new second floor—will add studio space and further strength zones.
Project Info
- Client : Independent Gym
- Project Type : Commercial Extension
- Duration : 16 Weeks
- Scope : Shell, MEP, wet rooms
- Style : Industrial
- Next Phase : Second floor construction
Brief & Objectives
Increase capacity, improve wet-room provision and create a premium strength environment without losing the brand’s raw, industrial character. Future-proof the site for a second-floor addition.
Build & Fit-Out
We extended the envelope, upgraded slab zones and installed new drainage runs to serve the wet rooms. The training floor was re-planned with modular rigs, dedicated storage for plates and kettlebells, and resilient rubber flooring. Linear LED lighting and neon brand features deliver strong wayfinding and atmosphere.
MEP & Compliance
- • New hot & cold services with commercial mixers to shower blocks
- • Mechanical extract to wet rooms with humidity control
- • Lighting design to CIBSE levels for training areas
- • Anti-slip, easy-clean finishes and robust ironmongery
- • Fire strategy, emergency lighting and signage updates
Next Phase: Second Floor
We are now constructing a new second floor to add a multi-use studio and additional strength areas. Works include steel frame, deck, acoustic build-up and extended MEP to maintain comfort and capacity at peak times.
Client Feedback
“Members love the new flow and facilities. The changing rooms are bullet-proof and the training space feels twice the size.”